Installation

Installation content recovered from the public page index, including the Promat fire resistance test report reference.

Fire resistance report

The cached installation page linked to a Promat Australia fire resistance test report for Split Ezy Pro brackets, dated 07/10/2020.

Open Report PDF

Install intent

The product is positioned for HVAC and split air conditioning installation where consistency, speed and safer wall penetration details matter.

  • Plan wall penetrations and bracket position before rough-in.
  • Use qualified installation practices and applicable Australian requirements.
  • Refer to the report and supplier guidance for fire-rated applications.

Recovered backup note

The public cache preserved the report link and page heading, but not a full step-by-step installation manual. This rebuild keeps that page usable while avoiding unsupported technical claims.

For formal install instructions, keep supplier documentation and certifier requirements attached to the final deployment.

Installed bracket and services